Improving management competences on Excellence based Stress avoidance and working towards Sustainable organisational development in Europe
- Nov 6, 2025
- 3 min read
Start date 01-11-2017–End date 31-12-2020
EU Grant–791.558,00 €
Programme–Erasmus+
Key Action:
Cooperation for innovation and the exchange of good practices
Action Type:
Knowledge Alliances for higher education
Countries covered–4

Coordinator
Coordinator
ASOCIACION DE INDUSTRIAS DE CONOCIMIENTO Y TECNOLOGIA - GAIA - EUSKALHERRIKO EZAGUTZA ETA TEKNOLOGIA INDUSTRIEN ELKARTEA
🇪🇸 Spain
Summary
Background
The reason for this project is twofold: Stress causes illness in persons and organisations and thus becomes a big economic cost factor. Stress is an important occupational safety and health (OSH) concern in about 80% of European businesses and is one of the main reasons for lost working days. However, less than a third of European organisations have procedures in place to deal with work-related stress. The survey shows that there is often a lack of expertise and specialist support.
Objectives
The objectives and the results are: 1. Develop an education module based on experiences in industry that will equip professionals working in industry with the necessary knowledge and skills. Divided in basic and especialised training (for different stakeholders)2. Develop a suite of practical tools that can be used by suitably trained professionals to quantify stress levels in an organisation and at an individual level, 3. Design and pilot test an appropriate training (per country)
Implementation
The implementation of the project has been carried out without any problem. All the programmed tasks have been developed. Last part of project (piloting phase) was affected by COVID-19 situation in Europe. Piloting phase at university with classess was affected and run mainly in on-line format. Piloting phase with companies was affected and executed mainly in on-line format. We asked for the extension of the project (2 months) in order to facilitate the finalisation of the piloting phase.
Results
All the expected results have been developed.The IMPRESS solution is formed by the following tools/applications:The personal/individual Stress Factor Assessment. (ENG, SP, GER, LT). Free of useThe web-based training modules (4 modules Basic training). (ENG, SP, GER, LT). Free of use after registrationAdditional training support materials, (ENG). (8 modules). For assessment supportThe Corporate & Individual Stress Factor Assessment (ENG, SP, GER, LT). Commercial useFroject deliverables
Partners
BIEDRIBA EUROFORTIS
🇱🇻 Latvia
IBK MANAGEMENT SOLUTIONS
🇩🇪 Germany
IIC INTERNATIONAL INDUSTRIAL CONSULT GMBH
🇩🇪 Germany
LUDWIG-MAXIMILIANS-UNIVERSITAET MUENCHEN
🇩🇪 Germany
MUTUALIA MUTUA COLABORADORA CON LA SEGURIDAD SOCIAL NO 2
🇪🇸 Spain
RIGAS AUSTRUMU KLINISKA UNIVERSITATES SLIMNICA SIA
🇱🇻 Latvia
RIGAS TEHNISKA UNIVERSITATE
🇱🇻 Latvia
UNIVERSITAT DE BARCELONA
🇪🇸 Spain
WATERFORD CHAMBER OF COMMERCE
🇮🇪 Ireland
Results
Organizational and working documents:
IMPRESS QUALITY ASSURANCE PLAN
Description
Working document with the information related to quality assurance plan to be applied during project life. Part of the Project Manual
Contents
IMPRESS DISSEMINATION PLAN
Description
The purpose of the IMPRESS dissemination plan is to act as a guideline for the co-operation amongst the consortium partners regarding dissemination activities and to provide some general information on the preparation of formal documents like dissemination materials, reporting forms and dissemination activities.
This document is checked at least half-yearly for need of updates or changes and will be revised as needed.
Contents
QG1
Description
Quality Gate report regarding WP1 activity.
Contents
QG2
Description
Quality Gate report regarding WP3 activity
Contents
D24_QG3
Description
Quality Gate report regarding WP4 activity
Contents
WP6 summary report
Description
WP6 summary report of the activities and results
Contents
WP5 summary report
Description
WP5 summary report
Contents
D27.QG6
Description
Quality Gate 6. Consolidated pilot action report
Contents
D28. QG7
Description
Quality Gate 7: IMPRESS release candidate
Contents
Description
WP8 activity report with the piloting phase activity and compilation of the case studies per country.
Contents
Others:
IMPRESS coaching & training modules (ENG)
Description
Basic training materials developed in English. This material was included in the online platform
Contents
IMPRESS coaching & training modules (SP)
Description
Basic training materials developed in Spanish. This material was included in the online platform.
Contents
IMPRESS coaching & training modules (GER)
Description
Basic training materials developed in German. This material was included in the online platform
Contents
IMPRESS coaching & training modules (LTV)
Description
Basic training materials developed in LATVIAN. This material was included in the online platform